ATTREX 12/17/12 Daily Schedule

12/17 Accomplishments:
HU/PCRS completed their environmental and SIL bench testing
UCATS checked the linearity of their calibrations with the electron capture detectors (ECD)
GWAS continued lab set up and check out and canister cleaning
MPCS unit retracted pin fixed
Ballast heat load (on lighter weight support pallet) installed

12/18 Plans:
Reinstall the MPCS unit
Integrate PCRS
Reinstall DLH, Mini-DOAS, FCDP, UCATS, SSFR sensors
Preparations for outdoor iridium test on 12/19