ATTREX 02/17/15 Mission Daily Schedule
Overview:
- MMS and GHOST wiring issues resolved, outdoor Satcom Testing continues tomorrow.
- Expectation of Pre-CST by COB tomorrow.
- P.I.’s - see arrival schedule below to support testing and Pre-CST
Accomplishments:
- NGC reports CAST/ATTREX payload passes shear-bending analysis
- GHOST Cryostat cool-down and re-installation on aircraft
- MMS wiring and GHOST IT issues resolved
- Tech Brief Slide run-through
- Weekly CAST/ATTREX Leads Telecom
Issues/Watch items:
- MMS wiring issue required all day to resolve – no outdoor Satcom Testing accomplished today.
Upcoming Schedule:
Wednesday:
- Crew to stage aircraft at normal Ku-testing location, ready for power at 0730
- MMS, GHOST, AIITS & Hawkeye: please report to GHOC at 0730
- O3, NWV, MTP & GWAS: please report to Payload Cage at 0900 (You’ll be called to GHOC as needed by Caitlin)
- Aircraft outdoor testing all day hopefully concluded with Pre-CST.
Thursday:
- Maint and Avionics aircraft final prep for CST
Friday:
- All personnel participate in CST: Schedule TBA