Skip to main content

Log in

Home
NASA Airborne Science Program
  • Program
    • Documents
    • Videos
  • Platforms
    • All Platforms
    • Aircraft Comparison
    • 3D Models
    • Cost Planning
    • Inactive Aircraft
  • Schedule
    • Aircraft Current Status
    • Aircraft Overview Schedule
    • Aircraft Detailed Schedule
    • 5 - Year Plan
  • Instruments
    • Instrument Database
    • Facility Instruments
    • Payload Information Form
    • Instrument FAQs
  • Mission Tools
    • Aircraft Tracker
    • MTS
  • Flight Request
  • PI Support
    • Current Call Letter
    • SATCOM Requirements
    • Research Opportunities
      • NSPIRES
      • ASP Call Letter

Breadcrumb

  1. Home

All %1 Images

Unknown

P-3 ready to go and back in the hangar until deployment date, March 12, 2012. (WFF)
NASA DC-9, The Vomit Rocket, standing by to load our cargo (WFF).
OIB cargo being uploaded onto NASA DC-9. (WFF)
Preparing for departure. DC-9, (WFF.)
With 4 P-3 engine heaters, there was almost no room to spare. Almost.(WFF)
One more box for GRIT gets picked up at the 109th ANG. (Schenectady, NY)
Ready to unload some cargo. Temperature: a bone-freezing -50 F. (Kangerlussuaq, Greenland)
Unloading aircraft engine heaters and some cargo. (Kangerlussuaq, Greenland)
After enduring very cold temperatures and solving several issues due to the freezing weather, the DC-9 gets ready to get on the way.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 247
  • Page 248
  • Page 249
  • Page 250
  • Current page 251
  • Page 252
  • Page 253
  • Page 254
  • Page 255
  • …
  • Next page Next ›
  • Last page Last »

NASA

National Aeronautics and
Space Administration

ASP Main Menu

  • Program
  • Platforms
  • Schedule
  • Instruments
  • Mission Tools
  • Flight Request
  • PI Support
  • Privacy Policy
  • FOIA
  • Contact
  • Accessibility

Page Last Updated: April 22, 2017

Page Editor: Brad Bulger

NASA Official: Mihailo Derek Rutovic

Website Issues: Contact Us