DCOTSS

DCOTSS 05/07/21 Mission Daily Schedule

0700 - 1500 Lab access 
0800 - 1500 A/C crew support (or, as long as needed)
Achievements and goals

PALMS 
-- troubleshoot A/C power cable pinout
-- successfully powered up from 120V supply
-- repositioned two top components, eliminated all mechanical interferences. 
-- test powering up from the EIP (i.e., aircraft power simulator)

DPOPS
-- DPOPS plumbing work
-- continue plumbing manifold work tomorrow

MMS
-- integration work in the fixed nose area (on the aircraft)
--built new cables

DCOTSS 05/03/21 Mission Daily Schedule
The Plan of the Day (POD) for tomorrow May 3rd:
·       0700 DAN CZICZO (PALMS): Arriving for Badge Enrollment CAITLIN MURPHY (ESPO): Arriving for Badge Enrollment
·       0715 JUSTIN JACQUOT (PALMS): Escorted by Caitlin Murphy Arriving for Badge Enrollment
·       0730 DAN CHIRICA (ESPO) Escorting Xiaoli 1:1: Arriving for Badge Enrollment
·       0745 XIAOLI SHEN (PALMS) Escorted by Dan Chirica 1:1: Arriving for Badge Enrollment