FIREX-AQ 06/12/19 Mission Daily Schedule

Wednesday, 6/12, Accomplishments:

  • LARGE, TOGA, Mini-DOAS, CIT-CIMS, LINeph & Master performed instrument checks, integration refinements, maintenance around the O2 system work
  • DIAL prepped for calibration

Thursday, 6/13, Plans:
Still inside
0600 A/C access – continuous power until 1300.
**Please show at 0600 if you requested multiple hours of continuous power.
**O2 work concurrent; could be crowded
**After 1300, possible power interruption and clearing the A/C for O2 system work
13:00 Lab meeting (daily)
17:30 Access ends
 
Outlook (changed from yesterday): 
Friday: 07:00-15:30. Details depend on how O2 testing goes Thursday. One possibility is that the A/C is inside until Monday morning.
Saturday: 07:00-15:30 A/C access
 
ATTN: CANOE, ISAF, NOAA PTR-MS, ROZE, SP2, WAS -- Send heater system schematics to Paul Martinez/Brennan Wehr.  ( paul.a.martinez@nasa.gov  brennan.wehr@nasa.gov )
Sign your tip over sheets. Label gas bottles.
Send pressure system schematics to Richard Wong – even for your ground pressure systems.
Empty gas bottles need to be in the empty bottle area on the back side of building 716.
Everyone should bring their own drink cup/lid for use in the lab and on flights. There is no supply of disposable cups and lids for coffee/water.
Tools taken from community A/C tool box must be returned at the end of the day.
Keep the emergency shower area in the lab free from obstructions.
RSVP to the Google survey about the June 20 Reception.