ATTREX 02/20/15 Mission Daily Schedule
Overview:
- Instruments and aircraft ready for CST on Monday, Flight on Tuesday
- Note to all Inst. PI’s – please see GHOC show schedule below
Accomplishments:
- AFRC “Tech Brief” held – CAST/ATTREX Science Flight Request approved and signed
- MMS Nav-data cable repaired – tests confirm good data
- GHOST and AIITS testing
- Maintenance and avionics pre-flight activity
- HDVis camera upgraded with new heater film – installed on aircraft
- AFRC Ku Ground Station reinstalled and will be used during Range Flt.
Issues/Watch items:
Upcoming Schedule:
Saturday/Sunday
- No known activity planned in Payload Cage – no aircraft access
Monday: CST Schedule
- 0615: GHOST LN2 Fill in the Hangar
- 0730: T-0 Briefing in Payload Cage
- 0800: All Instr. P.I.’s required in GHOC
- CST: ~0815 to ~1100
- 1300: T-1 Briefing for Range Flt (B4840, Rm 113B)
Tuesday: Range Flight
- 0400: GHOST LN2 Fill in the Hangar
- 0500: T-0 Briefing (B4840, Rm 113B)
- 0550: All Instr. P.I.’s required in GHOC
- 0600: Engine Start
- 0700: Take-off