ATTREX 01/09/13 Daily Schedule

1/9 Accomplishments:
Aircraft rolled out and Ku system locked on satellites
Unfortunately the ground station did not have the same success
MTP successful with iridium checks
GWAS confirmed system fix incorporated on Monday
DLH identified possible bad ethernet cable
UCATS team gets ethanol in the hangar

1/10 Plans:
Continue effort to locate satellites with Ku ground station, possibly using signal from aircraft (weather permitting, high winds forecast, crew will decide when they get in)
If ground station satellite pointing is successful go through pre-CST