0700 — 1500 ER2 support and Lab access (as long as needed)
0730 — Yaowei badging
0800 — Yaowei mask fitting, room S241.
Achievements
DPOPS
- Final fit check
- Finished plumbing
- Electric check with EIP
PALMS
- Connected to the two inlets
- Weight & balance the nose
MMS
- integration work in the fixed nose area of the aircraft
Goals for Tuesday
DPOPS
- particle size calibration
- welcome new team member
PALMS
- laser alignment
- software work with remote access
MMS
- Power checks with aircraft power in both fixed and removable nose areas