Skip to main content

Log in

Home
MMS
  • Program
    • Documents
    • Videos
  • Platforms
    • All Platforms
    • Aircraft Comparison
    • 3D Models
    • Airborne Science Customer Feedback
    • Cost Planning
    • Inactive Aircraft
  • Schedule
    • Aircraft Current Status
    • Aircraft Overview Schedule
    • Aircraft Detailed Schedule
  • Instruments
    • Instrument Database
    • Payload Information Form
    • Instrument FAQs
  • Mission Tools
    • Aircraft Tracker
    • MTS
  • Flight Request
  • PI Support
    • Current Call Letter
    • SATCOM Requirements
    • Research Opportunities
      • NSPIRES
      • ASP Call Letter
  • HOME
  • ONE PAGER
  • INSTRUMENTS
  • DATA PLOTS
    • Pressure Altitude, Longitude and Latitude and TAS
    • Pressure and Temperature
    • Wind
    • Differential Altitude, Longitude and Latitude
    • Pitch, Roll and Heading
  • AIRCRAFT INSTALLATION
    • ER-2 SOLVE Installations
    • ER-2 CRYSTAL-FACE Installation
    • DC-8 CAMEX4 Installations
    • WB-57 CRYSTAL-FACE Installations
    • WB-57 POSIDON Installations
    • GLOBAL HAWK GLOPAC Installations
    • SIERRA Rail Road Valley Installations
    • ALPHA JET AJAX Installations
  • PERSONNEL
  • CONTACT US

Breadcrumb

  1. Home
  2. Mission Daily Schedule

OIB 10/27/18 Mission Daily Schedule

1500 Ground crew at the airport to move the plane into position to fuel and service.
1700 Power on and access to the aircraft
1800 Preflight briefing 
1830 Doors close
1900 Take off time for an 11 hour flight

NASA

National Aeronautics and
Space Administration

ESPO Main Menu

  • ESPO
    • Missions
    • About ESPO
    • Video about ESPO
    • Deployment Sites
    • Aircraft
  • ESPO Archive
    • Browse
    • Help
  • Flight Request
  • ASP Mission Tool Suite
  • Privacy Policy
  • FOIA
  • Contact
  • Accessibility

Page Last Updated: October 26, 2018

Page Editor: Vidal Salazar

NASA Official: Mihailo Derek Rutovic

Website Issues: Contact Us