ORACLES 08/29/18 Mission Daily Schedule

Achievements August 29 and plans for August 30

UND/wing probes

  • Decision to use new canister; ready to be installed and tested either late next Wed or Thurs
  • Rack will be ready to be loaded onto the plane tomorrow morning
  • Can start testing probes on the right wing
  • Left inboard side could possibly be done late tomorrow 

PDI

  • Cases arrived at the hangar today and Jennifer was able to get everything on the plane. She needs the UND rack to be installed tomorrow morning to connect the wiring and start testing.

HiGEAR

  • Packing air shipment cases

Data Systems

  • Eric needs some time on the plane with the power off to run some stuff through the load center (tonight after other teams are done)
  • Pins for the Litton will be here tomorrow, system checks possible

Schedule for August 30:
0800 hangar/labs open


0815 punch list meeting and a/c door open

1600 a/c power off

NLT 1615 – meeting to review work completed & tomorrow's plan

1630 mech/eng support ends

Kelly