DCOTSS 05/11/21 Mission Daily Schedule

0700 — 1500 ER2 support and Lab access (as long as needed)
0730 — Yaowei badging
0800 — Yaowei mask fitting, room S241. 

Achievements

DPOPS 
- Final fit check 
- Finished plumbing 
- Electric check with EIP

PALMS
- Connected to the two inlets
- Weight & balance the nose

MMS 
- integration work in the fixed nose area of the aircraft

Goals for Tuesday

DPOPS 
- particle size calibration
- welcome new team member

PALMS
- laser alignment 
- software work with remote access

MMS
- Power checks with aircraft power in both fixed and removable nose areas