KORUS-AQ

Synonyms
KORUS-AQ (HL 5200)
KORUS-AQ 04/26/16 Mission Daily Schedule

UPDATE (LaRC UC-12B)
- Plan to complete cabling, run chiller lines, and update paperwork Wednesday.
- Plan to be ready for Instrument Check Flight Thursday morning.

UPDATE: DC-8 landed in Anchorage ~ 0915L/departed around 1145L. Currently traveling @ 507 Knots/30500ft on its way to OsanAB.

UPDATE (Osan AB): KORUS-AQ personnel arriving @ Osan in NASA DC8: Upon landing, board the awaiting bus. It'll take u to the AMC terminal x customs/immigration. After customs/immigration, same bus will take you from AMC Terminal to the Turumi lodge.

KORUS-AQ 04/25/16 Mission Daily Schedule

OSAN AB: YOUR SEATING/OFFICE ARRANGEMENTS
We have assigned a table for every two people (or two tables depending on the size of the team and specific requirements.) Every table has a sign with your instrument team on it, please stick to the plan until everyone has settled in, we do not have more room in the building to accommodate for extra tables/chairs. The following are the list of room numbers and the instruments in it. 

KORUS-AQ 04/21/16 Mission Daily Schedule

END OF DAY REPORT 
4/21: Thursday Progress
AFRC DC-8 has completed its Second Instrument Test Flght.  Aircraft in good shape.
Several issues with instruments (to be expected) and continuing to work to success. 
------------------------
Schedule:
4/22:  Friday
0700 –1700 Aircraft access
DC-8 related parts/tools to be loaded onto aircraft
1000 Critical Spares - Suitcases - Air Shipment Departs - ETA Osan AB 4/28

Airborne Expedition Tackles Global Air Quality Problem

Next week NASA and the Republic of Korea’s National Institute of Environmental Research (NIER) embark on the collaborative Korea United States Air Quality study (KORUS-AQ). The KORUS-AQ field campaign will combine observations from aircraft, satellites, ships and ground stations with air quality models to assess and monitor air quality across urban, rural and coastal areas.