HS3
HS3 Dryden POD
Monday, August 27, 2012
AV6 – Instrument PI access 0700-0900
AV6 – Preflight for Tuesday's Range Flight 0900-1500
Wallops POD - All times EDT
Monday, 8/27
DFRC: PreFlight for Range Flight planned for 8/28
WFF:No PI teams required
HS3 Dryden POD 2012-08-26
Saturday, August 25, 2012
AV6 CST was successful conditionally
Sunday, August 26, 2012
Hard Down Day - No access to Aircraft
PI Hangar access 0900-1200
Monday, August 27, 2012
AV6 – Instrument PI access 0700-0900
AV6 – Preflight for Tuesday's Range Flight 0900-1500
Wallops POD - All times EDT
Sunday, 8/26
WFF: No PI teams required - Hard Down Day
Monday, 8/27
DFRC: PreFlight for Range Flight planned for 8/28
WFF:No PI teams required
HS3 Dryden Plan of the Day 2012-08-25
Friday, August 24, 2012
AV6 Aircraft system testing was successful
Saturday, August 25, 2012
0500 T-0 preflight meeting
0600 AV6 CST
AV6 Instrument PIs should be in the GHOC by 0600
HS3 Wallops Plan of the Day 2012-08-25
WFF: All times EDT
Saturday, August 25, 2012
0800 Each instrument team should have at least one member in the PMOF for CST
0900 CST
PLEASE NOTE THE EARLIER CST START TIME
Thursday, August 23, 2012
AV6 Aircraft system testing continued
HS3 Dryden Plan of the Day 2012-08-24
0800-1200 AV6 Aircraft Operational Testing
1200-1500 Preflight for CST on Saturday
HS3 Wallops Plan of the Day 2012-08-24
WWF: All times EDT
1100-1500 Communication checks
No PI teams required
1330 Make up Safety Brief in conference room
Saturday, 8/25
1000 Each instrument team should have at least one member in PMOF for CST