HS3 08/15/13 Daily Schedule

Dry Run continues daily through 08/16 (this Friday) at 0800 PDT/1100 EDT

On Saturday we commence regular Forecast briefings at 0830 and 2030 EDT

 

DFRC UPDATE (PDT):

AV-6 Goals:

Thursday Aug 15:

AV-6 Ferry

1700 Engine Start

1800 Take Off

Shipping - Coordinate with Dave Jordan on details

Friday August 16: truck shipment departs

 

WFF UPDATE (EDT):

AV-6 Goals:

Thursday Aug 15:

AV-6 Ferry

1930  PIs take places in GHOC – E

2000 Engine Start

HS3 08/14/13 Daily Schedule

Dry Run continues daily through 08/16 (this Friday) at 0800 PDT/1100 EDT

On Saturday we commence regular Forecast briefings at 0830 and 2030 EDT

 

DFRC UPDATE (PDT):

AV-6 Goals:

Pending: Nose camera lens installation and checkout

Thursday Aug 15:

AV-6 Ferry

1700 Engine Start

1800 Take Off

Shipping - Coordinate with Dave Jordan on details

Friday August 16: truck shipment departs

 

WFF UPDATE (EDT):

AV-6 Goals:

Pending: Nose camera lens installation and checkout

HS3 08/13/13 Daily Schedule

Dry Run continues daily through 08/16 (this Friday) at 0800 PDT/1100 EDT

 

DFRC UPDATE (PDT):

AV-6 Goals:

Pending: Nose camera lens installation and checkout

AV-1 Goals:

Tuesday Aug 13:  AV-1 Ferry

1700 Engine Start

1800 Take Off

Wednesday Aug 14:

AV6 Instrument Access for preflight (1000-1300)

Aircraft preflight

AV-1 PI's coordinate shipping details with Dave Jordan by noon Wednesday

Thursday Aug 15:  truck staging and AV-6 Ferry

1700 Engine Start

HS3 08/12/13 Daily Schedule

Dry Run continues daily until 08/16 at 0800 PDT/1100 EDT

 

DFRC UPDATE (PDT):

AV-6 Goals:

Pending: Nose camera lens installation and checkout

AV-1 Goals:

Monday Aug 12:

AV1 Instrument Access for preflight (1000-1300)

AV-1 Aircraft preflight

Tuesday Aug 13:  AV-1 Ferry

1800 Engine Start

1900 Take Off

Wednesday Aug 14:

AV6 Instrument Access for preflight (1000-1300)

Aircraft preflight

Thursday Aug 15:  AV-6 Ferry

1800 Engine Start

HS3 08/09/13 Daily Schedule

A quote from an instrument team member late for a deadline…."My biggest mistake was not reading the POD."

 

DFRC UPDATE:

AV-6 Goals:

Pending: Nose camera lens installation and checkout

AV-1 Completed:

Friday Aug 9:  Instrument Postflight

AV-1 Goals:

Saturday Aug 10:  No PI activities

Sunday Aug 11:  Hard down Day

TENTATIVE PLAN FOR NEXT WEEK

Monday Aug 12:

AV1 Instrument Access for preflight (1000-1300)

AV-1 Aircraft preflight

HS3 08/08/13 Daily Schedule

DFRC UPDATE:

AV-6 Goals:

Pending: Nose camera lens installation and checkout

AV-1 Completed:

Instrument Range Flight

AV-1 Goals:

Pending: Nose camera lens installation and checkout

Friday Aug 9:  Instrument Access for Postflight and, if desired, ferry

post/preflight (1000-1400)

Possible PI shipment to WFF. Contact Dave Jordan in hangar 4840, extension 2050.

Saturday Aug 10:  No PI activities.

Sunday Aug 11:  Hard down Day

HS3 08/07/13 Daily Schedule

Forecast Dry Run; August 6-16; See email sent to list serve on 7/30/13, titled 'HS3 Dry Run 2013'.

Please Note: Transits next week  are planned for takeoff at ~7 pm PDT; land ~0800 EDT. There is a possibility of a longer flight due to weather, science goals, or range conflicts. Please plan accordingly. See GHOC and GHOC-E Instrument Team Staffing notes below.

DFRC UPDATE:
AV-6 Goals:

Pending: Nose camera lens installation and checkout

AV-1 Completed:

Instrument Post/Pre-flight and Aircraft Preflight

HS3 08/06/13 Daily Schedule
DFRC UPDATE:
AV-6 Goals:

Pending: Nose camera lens update

AV-1 Completed:

CST

AV-1 Goals:

Pending: Nose camera lens update

Wednesday August 7;  Instrument pre-flight and aircraft pre-flight

PI access 0800-1000 PDT

Thursday August 8;   Range Flight

PIs not required

Engine start 0600

Take off 0700

Landing 1200

Friday August 9: shipment prep

WFF UPDATE:
AV-1 Completed:

CST

AV-1 Goals:

Thursday August 8;   Range Flight

HS3 08/05/13 Daily Schedule
DFRC UPDATE:
AV-6 Completed:

fueled

AV-1 Completed:

pre-CST

AV-1 Goals:

Pending: Nose camera lens update

Tuesday, August 6: CST; PI's optional, arrive 1100 in hangar. 1130 engine start

(delayed start due to airfield conflict)

Wednesday August 7: instrument pre-flight and aircraft pre-flight

Thursday August 8: range flight

Friday August 9: shipment (begin to think about this)

WFF UPDATE:
AV-1 Completed:

pre-CST

AV-1 Goals:

Tuesday August 6 - CST 1430

HS3 08/02/13 Daily Schedule
DFRC UPDATE:
AV-1 Completed:

HIWRAP software update

ADELE re-installed

2 trucks loaded

AV-1 Goals:

Pending: Nose camera lens update

Monday August 5 - pre-CST; PI's arrive 0800 in hangar. Comsec training ~1300

AV-6 Completed:

Friday August 2 - instrument post-flight; SHIS/AVAPS crates to DFRC shipping

WFF UPDATE:
AV-1 Goals:

Monday August 5 - pre-CST 1100

1000 PIs check in with ESPO

1030 PI's in GHOC-E

1100 pre-CST