0700 - 1500 Lab access
0800 - 1500 A/C crew support (or, as long as needed)
Achievements and goals
PALMS
-- troubleshoot A/C power cable pinout
-- successfully powered up from 120V supply
-- repositioned two top components, eliminated all mechanical interferences.
-- test powering up from the EIP (i.e., aircraft power simulator)
DPOPS
-- DPOPS plumbing work
-- continue plumbing manifold work tomorrow
MMS
-- integration work in the fixed nose area (on the aircraft)