BioSCape

BioSCape 10/23/23 Mission Daily Schedule
BioSCape Plan of the Day
 
Monday, 23 October (All times local)
 
NASA JSC G-V -- Science Flight #3
NASA LaRC G-III -- Science Flight #2
 
0530 -- Shuttle SSUN to FBO
0630 -- Shuttle SSUN to FBO
 
0700 -- Go/No-go Meeting at SSUN
 
0830 -- G-III Take Off
G3-13 (FL 165); Extra pick up coastal lines (FL as determined by aircrew); Calibration G3-19 (FL 195 as determined by aircrew)
G3-9; (if this plan is flown, a mi
BioSCape 10/22/23 Mission Daily Schedule
Sunday, 22 October (All times local)
 
NASA JSC G-V -- Science Flight #2
NASA LaRC G-III -- Science Flight #1
 
0600 -- Shuttle SSUN to FBO (G-V Mx, Instrument Teams, Return night fire watch)
0700 -- Forecasting & Go/No-go Meeting, New conference room
0720 -- Shuttle SSUN to FBO (G-V flight crew, G-III Mx & Others)
0800 -- Shuttle SSUN to FBO (G-III flight crew, Others)
 
0900 -- G-V Take Off
Box 2
Calibration site (-34.016727, 19.17712
BioSCape 10/21/23 Mission Daily Schedule
BioSCape Plan of the Day
 
Saturday, 21 October (All times local)
 
NASA JSC G-V -- Down Day
Instrument access to the plane
NASA LaRC G-III -- Down Day
Instrument access to the plane
 
0600 -- Shuttle, SSUN to FBO (Fire Watch)
0900 -- Shuttle, SSUN to FBO (Science and Crew)
TBD -- Shuttle, FBO to SSUN (Science and Crew)
1800 -- Shuttle, SSUN to FBO (Fire Watch)
 
NO 0700 MEETING
 
1600 - 170