ACCLIP
Plan of the Day, Saturday, Sep 3, 2022
NASA WB-57 Maintenance
As of right now, we have the following milestones that should help you get organized for the last phase of the deployment. Keep in mind that these are estimates, stay flexible:
- WB-57 arrival at Ellington: Sunday, Sep. 11
- Air Shipment arrival at Ellington: Thursday, Sep. 15
It would be prudent to allow for a day or two for the cargo to arrive at Ellington, so we suggest that you consider the week of Sept. 19 – 23 to receive your air shipment.
Meetings: None
NASA WB-57 Schedule
WB-57 Maintenance, access on request only (coordinate with Mo)
Looking Ahead
Sunday, Sep 4: WB Hard Down
Monday, Sep 5: WB Hard Down
Tuesday, Sep 6: WB Departure 1400 KST
Notes:
- When you are done uploading your instrument, please ensure you have all your other items packed and ready for sea and air shipment.
- We have extended the date in the travel intentions section for de-integration on the ESPO website. If you are going to JSC Ellington Field for de-integration, please check your registration and update your travel intentions as needed. You can contact Residence Inn directly (Karrie.myer@marriott.com) to update/modify your reservations.
To email all ESPO team members on site at Osan AB, please email acclip-espo@espo.nasa.gov
Plan of the Day, Thursday, Sep 1, 2022
NASA WB-57 RF17
Meetings:
0930 – 1000: WB Mission Brief
LOCATION: Briefing Room, Bldg. 1182 and via WebEx: https://espo.webex.com/espo/j.php?MTID=m75cce888d864e8912e57aa1084b9f47c
- Meeting number: 2559 958 3664
- Password: @cclip2022
- Join by phone (Access code: 2559 958 3664)
- US/Canada: +1-650-479-3207 / +1-855-244-8681
- Korea: +82-70-7488-5000
NASA WB-57 Schedule
0700 MX at the hangar
0800 Instrument Upload
0900 Instruments Hand Off
0930 Mission Brief Go/No-Go (see virtual meeting details above)
0930 Aircraft tow/fuel
1030 Aircrew Suit Up
1115 Aircrew/Cockpit Integration
1130 Engine Start
1150 Taxi
1200 Take Off
1800 Landing
TBD Flight De-brief (Ops Center)/Payload access
Looking Ahead
Friday, Sep 2: WB-57 Maintenance
Saturday, Sep 3: WB-57 Maintenance
Sunday, Sep 4: WB Hard Down
To email all ESPO team members on site at Osan AB, please email acclip-espo@espo.nasa.gov
Plan of the Day, Wednesday, Aug 31, 2022
NASA WB-57 RF16
NCAR G-V RF14, GV Departure for Anchorage
Meetings:
0730 – 0930: WB Mission Brief
LOCATION: Briefing Room, Bldg. 1182 and via WebEx: https://espo.webex.com/espo/j.php?MTID=m75cce888d864e8912e57aa1084b9f47c
- Meeting number: 2559 958 3664
- Password: @cclip2022
- Join by phone (Access code: 2559 958 3664)
- US/Canada: +1-650-479-3207 / +1-855-244-8681
- Korea: +82-70-7488-5000
NASA WB-57 Schedule
0500 MX at the hangar
0600 Instrument Upload
0700 Instruments Hand Off
0730 Mission Brief Go/No-Go (see virtual meeting details above)
0730 Aircraft tow/fuel
0830 Aircrew Suit Up
0915 Aircrew/Cockpit Integration
0930 Engine Start
0950 Taxi
1000 Take Off
1600 Landing
TBD Flight De-brief (Ops Center)/Payload access
NCAR G-V Schedule: (Pavel announcement)
0600 Power and access
0900 Take Off
Looking Ahead
Thursday, Sep 1: WB-57 RF17
Friday, Sep 2: WB-57 Maintenance
Saturday, Sep 3: WB-57 Maintenance
To email all ESPO team members on site at Osan AB, please email acclip-espo@espo.nasa.gov
Plan of the Day, Monday, Aug 29, 2022
NASA WB-57 RF15
NCAR G-V RF13
Meetings:
0730 – 0930: WB Mission Brief
LOCATION: Briefing Room, Bldg. 1182 and via WebEx: https://espo.webex.com/espo/j.php?MTID=m75cce888d864e8912e57aa1084b9f47c
- Meeting number: 2559 958 3664
- Password: @cclip2022
- Join by phone (Access code: 2559 958 3664)
- US/Canada: +1-650-479-3207 / +1-855-244-8681
- Korea: +82-70-7488-5000
NASA WB-57 Schedule
0500 MX at the hangar
0600 Instrument Upload
0700 Instruments Hand Off
0730 Mission Brief Go/No-Go (see virtual meeting details above)
0730 Aircraft tow/fuel
0830 Aircrew Suit Up
0915 Aircrew/Cockpit Integration
0930 Engine Start
0950 Taxi
1000 Take Off
1600 Landing
TBD Flight De-brief (Ops Center)/Payload access
NCAR G-V Schedule: (Pavel announcement)
0700 Power and access
1000 Take Off
Looking Ahead
Tuesday, Aug 30: WB-57 Maintenance & Aircraft Access; G-V Pack Day
Wednesday, Aug 31: WB-57 RF16; G-V RF14, Departure for Anchorage
Thursday, Sep 1: WB-57 Maintenance & Aircraft Access
Notes:
- If you are the last one leaving any of our facilities, please turn off the lights, set A/C units to 25C
- You must wear a reflective vest when outside the hangar/ops area (inside the flight line)
- You must lock the flight line gate (and scramble code) after you enter and when you leave. To unlock, use 808 on the red zip tie.
- It is important that we minimize the risk to our operations, please consider wearing a mask if you must work in very close proximity to others in enclosed spaces. Also, please remember to conduct your second post arrival test (6th day after arrival). If you need a test kit, let us know, we can provide you one. If you want to test yourself for any reason, and need a test kit, we can provide you one.
- Please monitor your health. If you experience any cold like symptoms such as fever, sore throat, cough, fatigue, etc., refrain from close contact with others and do a self-test.
Plan of the Day, Monday, Aug 29, 2022
NASA WB-57 RF15
NCAR G-V RF13
Meetings:
0730 – 0930: WB Mission Brief
LOCATION: Briefing Room, Bldg. 1182 and via WebEx: https://espo.webex.com/espo/j.php?MTID=m75cce888d864e8912e57aa1084b9f47c
- Meeting number: 2559 958 3664
- Password: @cclip2022
- Join by phone (Access code: 2559 958 3664)
- US/Canada: +1-650-479-3207 / +1-855-244-8681
- Korea: +82-70-7488-5000
NASA WB-57 Schedule
0500 MX at the hangar
0600 Instrument Upload
0700 Instruments Hand Off
0730 Mission Brief Go/No-Go (see virtual meeting details above)
0730 Aircraft tow/fuel
0830 Aircrew Suit Up
0915 Aircrew/Cockpit Integration
0930 Engine Start
0950 Taxi
1000 Take Off
1600 Landing
TBD Flight De-brief (Ops Center)/Payload access
NCAR G-V Schedule: (Pavel announcement)
0700 Power and access
1000 Take Off
Looking Ahead
Tuesday, Aug 30: WB-57 Maintenance & Aircraft Access; G-V Pack Day
Wednesday, Aug 31: WB-57 RF16; G-V RF14, Departure for Anchorage
Thursday, Sep 1: WB-57 Maintenance & Aircraft Access