Plan of the Day for Saturday, April 29:
Updates:
- The B200 flew its 21st flight of the IOP-2 campaign, but clouds prevented MOSES and PRISM data collections.
- The Sally Ride is busy today recovering the Lagrangian Floats and also two Seagliders. Afterwards, the team will resurvey the target area and redeploy floats.
Aircraft plan and schedule:
- NET 1000: G-III SF#7 takeoff
- 1000: Preflight meeting for B200 SF#22
- NET 1100: B200 SF #22 takeoff (final B200 S-MODE flight)
Ship and in situ plan:
- The Sally Ride will follow the redeployed floats tomorrow with the Moving Vessel Profiler (MVP) and EcoCTD
Meeting schedule: