The website is undergoing a major upgrade that began Friday, October 11th at 5:00 PM PDT. The new upgraded site will be available no later than Monday, October 21st. Until that time, the current site will be visible but logins are disabled.

May 2021

Sun Mon Tue Wed Thu Fri Sat
25
26
27
28
29
30
1
« ER-2 - AFRC #806: 806 CARE Reassembly 2019-05-14 - 2021-11-26
»
 
 
 
 
 
 
 
2
3
4
5
6
7
8
« ER-2 - AFRC #806: 806 CARE Reassembly 2019-05-14 - 2021-11-26
»
 
ER-2 - AFRC #809: DCOTSS Fit Checks - POPS and PALMS 2021-05-03 - 2021-05-14
»
 
 
 
 
 
 
9
« ER-2 - AFRC #806: 806 CARE Reassembly 2019-05-14 - 2021-11-26
»
« ER-2 - AFRC #809: DCOTSS Fit Checks - POPS and PALMS 2021-05-03 - 2021-05-14
 
 
 
 
 
 
 
 
« ER-2 - AFRC #806: 806 CARE Reassembly 2019-05-14 - 2021-11-26
»
 
 
 
 
 
 
 
« ER-2 - AFRC #806: 806 CARE Reassembly 2019-05-14 - 2021-11-26
»
 
ER-2 - AFRC #809: DCOTSS Test Campaign Upload (HUPCRS, AWAS, ROZE, CAFÉ AND CANOE) 2021-05-24 - 2021-05-28
 
 
 
 
 
 
 
1
2
3
4
5
« ER-2 - AFRC #806: 806 CARE Reassembly 2019-05-14 - 2021-11-26
»
 
 
ER-2 - AFRC #809: DCOTSS Test Campaign Upload/Network Config 2021-06-01 - 2021-06-04